TANK INTELLIGENCE ENGINE

Know your tank.

Tie every report, scope and drawing to the physical tank it describes. See what the evidence says, what is missing, and how a budget was built.

For above-ground vertical steel storage tanks. Preliminary planning support, reviewed by competent engineers and estimators.

Fixed cone roof tankHeight, diameter: to be confirmed
Floating roof tankHeight, diameter: to be confirmed
ILLUSTRATIVE SCHEMATIC

ENERGY CONTEXT

Crude oil market watch

SAMPLE VALUES · NOT LIVE
Brent crude, USD / barrel
00.00
DATA TO [DATE]
WTI crude, USD / barrel
00.00
DATA TO [DATE]

Spot prices from the U.S. Energy Information Administration. EIA publishes them in a weekly batch, so the latest value can be several days old; the date shown is the date of the data. Context only: never an input to a T.I.E. estimate.

WHAT WOULD YOU LIKE TO DO?

Two ways in. One evidence trail.

Whether the tank is in service or still on paper, the work starts from your documents and ends with a reviewed, traceable planning output.

EXISTING TANK

Plan repair and maintenance

Interpret inspection records and a repair scope, reconcile what the sources say, and explore planning scenarios at four horizons.

5 years10 years15 years20 years

Horizons are planning scenarios, not a promise the tank will remain fit for service.

Start a repair assessment →

NEW TANK

Scope a new build

Turn an enquiry, specification or drawing into a requirements register, then a preliminary budget range with its basis shown.

Requirements registerOpen questionsLow / base / high range

Missing design inputs stay visible and are never silently filled in.

Start a new-build estimate →

HOW IT WORKS

From documents to a reviewed output

  1. 01

    Start

    Choose an existing tank or a new build and name the site, project and tank where known.

  2. 02

    Upload

    Add reports, scopes, drawings, schedules and photos. Originals are preserved, never overwritten.

  3. 03

    Interpret

    See a document inventory with processing status and quality warnings.

  4. 04

    Confirm

    Review proposed facts, conflicts, assumptions and open questions, each linked to its source.

  5. 05

    Assess

    Review work packages and estimates with quantity basis, rates, ranges and exclusions.

  6. 06

    Issue

    Receive a versioned report after the required engineering and estimating approvals.

INSIDE THE PORTAL

Every fact shows where it came from.

A document is evidence, not a tank fact, until it is extracted, linked and given an explicit status. Unknown, assumed, conflicting and verified values never blur together.

Review gates sit between the evidence and anything a client receives.

RELEASE GATES

  1. Extraction QA
  2. Technical scope
  3. Estimate
  4. Issue
Tank recordSynthetic example site, not client data
DRAFT · REVIEW REQUIRED
Example tank record showing each value with its status and source
FieldValueStatusSource
Stored productDieselSource statedSpec, p.2
Diameter42.0 mClient confirmedGA drawing
Shell height14.6 / 16.0 mConflictingSpec vs drawing
Wind / seismic basisNot suppliedReview requiredNot supplied
Hydrotest allowanceRangeAssumedAssumption A-03
Foundation basisNot suppliedMissingQuestion Q-07 open

PRINCIPLES

Built to support engineering judgement, not replace it

Tank-centred context

Projects, records, findings and estimates link to a stable physical tank.

Evidence before inference

Every extracted fact keeps its source, locator, method, version and review state.

Visible uncertainty

Unknown, conflicting, assumed and verified values stay separate.

Decision support

Outputs are preliminary planning information, never certification.

Human authority

Competent engineers and estimators control release.

NEW BUILD TANK DATA SHEET

Prepare your tank details first

Complete what you know, with units and a document reference. Mark gaps “Unknown” or “To be confirmed” and do not guess. One A4 page.

Talk to the T.I.E. team

Tell us about your tank, your documents and what you need to decide.

[Contact email, phone and address to be supplied.]